Scheduling: Time-Location Diagram

Scheduling Time Location Diagram 1 en

Linear Scheduling Method (LSM)
Also called Time-Location Diagram is the most effective type way to plan and manage projects that have repetitive activities, physical interruptions and that are linear. In this type of diagram the space is identified in the horizontal axis and the time in the vertical axis.

Time Location inglés

Highways, metros, trains, bridges, river dredging, hydraulic projects, electric transmission lines, pipelines, gas pipelines, cable cars, aqueducts and buildings are the perfect projects to be managed with the Linear Scheduling Method.

This type of schedule can be done in Excel or AutoCAD (the problem, when we use these type of apps, is presented when you need to update or compare the planned versus the project executed). The best softwares to manage linear projects are: Tilos, Turbo-Chart, LinearPlus, Planer ET, Vico Office, etc.

 


 

About Fractal - Ingenieros & Abogados

Fractal—Ingenieros & Abogados is a boutique firm that specializes in Project Management and Construction Law. It is focused exclusively on the Construction Industry.

Our comprehensive services include independent consultancy and advice on claims, contracts, risks, integrity, and project control. We cater to various clients, including law firms, claims consultants, commercial and multilateral banks, fiduciary and insurance companies, arbitration and adjudication courts, dispute boards, project owners, equipment and materials suppliers, national and foreign investors, and engineering and construction companies.

Write us
1000 characters left